Move Back
ADVERTISEMENT
Skip
Move Forward
  • "West Wing Phase Two Renovations" are officially complete.
  • President Donald Trump's new Oval Office design was revealed on August 22.
  • During the construction, the Oval Office was stripped of all furniture, carpet and decor.
  • President Donald Trump has officially stamped the Oval Office as his own with recent renovation.
  • The West Wing lobby of the White House is seen after a renovation in Washington
  • Construction materials and equipment are seen staged inside the historic Roosevelt Room in the West Wing during renovations
  • The Roosevelt Room of the White House is seen after a renovation in Washington
  • Construction workers lay carpet on a ramp from the West Wing offices to the White House colonnade during renovations
  • A chandelier is seen outside the Oval Office of the White House after a renovation in Washington
  • A worker cleans the South Portico porch stairs of the White House after a renovation in Washington
  • The South Portico porch steps of the White House are seen after a renovation in Washington
  • Construction cranes are set up while U.S. President Donald Trump is away on vacation from the White House in Washington